DNSR in Action

See the Robot Work

Real deployments. Real data centers. Watch DNSR execute live cable migrations with zero downtime.

Featured
Product Demo

Full Switching Sequence — Hyperscale Deployment

Watch DNSR-48G execute a complete port-to-port cable migration in a live hyperscale environment. Zero downtime. 4.2-second total sequence.

12:47

6:32
Technical

Live Migration: Zero-Downtime Switchover

A full live migration between two top-of-rack switches while traffic continues to flow. No packet loss. No maintenance window.

6:32

14:58
Technical

Compatibility Testing: 200+ Switch Models

Our engineering team runs DNSR through its full compatibility suite across Cisco, Arista, Juniper, and 15 other vendors.

14:58

2:14
Product Demo

FR10 Simulator: Patch Cable Demo

The connection can be controlled manually via the dashboard or executed automatically.

2:14

Colocation Deployment Walkthrough
18:05
Deployment

Colocation Deployment Walkthrough

Step-by-step installation of DNSR-48G in a shared colocation environment. From unboxing to first automated switch in under 2 hours.

18:05

Dashboard Deep Dive
11:20
Product Demo

Dashboard Deep Dive

Tour the DNSR control dashboard: real-time port mapping, switch health monitoring, and one-click migration scheduling.

11:20

2:30
Product Demo

FR10 Controller: Random Cable Routing

Watch the FR10 controller autonomously navigate and route patch cables across randomized port configurations — no pre-mapping required.

2:30

Ready to See It Live?

Schedule a personalized demo with our engineering team. We'll walk through your specific environment and switching requirements.